Introduced by the Great Northern Railway in 1921 to a design by Nigel Gresley, these powerful 2-8-0s were built to haul heavy mineral trains. Several batches were built over a 22 year period by the GNR and LNER, with numerous improvements such as better cabs and bigger tenders.
#*# Gresley O2/4 63932 BR Late Black
Pre-Order Deposit
This is a pre-order item. We will take a small deposit for your order now and take the remaining balance when we dispatch your item.